Investigating factors causing defects in Industrialised Building System (IBS) implementation for the People's Housing Programme (PPR) in Parit Buntar, Perak

Authors

  • Mohd Nazri Abdullah Department of Built Environment Studies and Technology, College of Built Environment, Universiti Teknologi MARA, Perak Branch, 32610, Seri lskandar, Perak, Malaysia
  • Mohd Esham Mamat Department of Built Environment Studies and Technology, College of Built Environment, Universiti Teknologi MARA, Perak Branch, 32610, Seri lskandar, Perak, Malaysia
  • Zaiwannizar Zainal Abidin Department of Built Environment Studies and Technology, College of Built Environment, Universiti Teknologi MARA, Perak Branch, 32610, Seri lskandar, Perak, Malaysia
  • Mohd Firdaus Zainuddin Department of Built Environment Studies and Technology, College of Built Environment, Universiti Teknologi MARA, Perak Branch, 32610, Seri lskandar, Perak, Malaysia
  • Muammad Nasharudine Shuib Department of Built Environment Studies and Technology, College of Built Environment, Universiti Teknologi MARA, Perak Branch, 32610, Seri lskandar, Perak, Malaysia

DOI:

https://doi.org/10.55573/JISED.118803

Keywords:

Industrialised Building Systems (IBS), defects, People Housing Program (PPR), satisfaction, defects contributors

Abstract

Industrialised Building Systems (IBS), or prefabrication, involves off-site manufacturing of components for easy installation. However, IBS faces challenges in Malaysia due to inadequate risk management, resulting in common failures. This paper objectives are to identify the types of defects and to analyse the causes of defects in the IBS project at PPR Parit Buntar, Perak housing. Questionnaires from 80 residents were analysed, revealing roof leaks as the primary defect. Interestingly, residents expressed high satisfaction with the quality of the house space. The findings also indicated that natural phenomena were the main contributors to defects in PPR housing. To enhance long-term satisfaction, it is recommended for housing developers and contractors to prioritize higher-quality materials in IBS projects.

Downloads

Download data is not yet available.

References

Abdullahi, M. R., Mohd, K., Mohd, M., Harun, A. T. And Arif, M. (2009) "Industrialised

building system: definition and concept". Paper proceedings in AR COM conference 2009, Nottingham, United Kingdom 7-9 September, 2009

Ahmad, M., Haseneshkorfu, 0. 0., & Nigar, K. (2017). The barriers to the implementation of industrialised building system (IBS) in high rise structure in Selangor. Int J Adv Mech Civ Eng, 4, 94-99.

Chong. W. K., and Low. S. P. (2006). Latent Building Defects: Causes and Design Strategies to Prevent Them. Journal Of Performance Of Constructed Facilities

lsnin et al. (2012). Sustainable Issues in Low Cost Housing Alteration Projects. (36), pp 393-401.

Low, C. M. & Mydin, M. A. 0., 2012. Cement and Concrete Composites. Case studies on construction defects on different types of walling system for building, pp.10354-10357.

Lambers, R., Lamari, F., Skitmore, M., Rajendra, D. (2023) Key residential construction defects: a framework for their identification and correlated causes Construction Innovation. Available at: https://www.scopus.com/inward/record.uri?eid=2-s2.0

N. Ahzahar, N.A. Karim, S.H. Hassan, J. Eman, (2011) 'A Study of Contribution Factors to Building Failures and Defects in Construction Industry, Procedia Engineering,' (20), pp 249- 255.

Othuman, Mydin M.A., Md Sani, N., & Phius, AF. (2014) 'Investigation of Industrialised Building System Performance in Comparison to Conventional Construction Method.' MATEC Web of Conferences. 10, pp. 1-6.

Olanrewaju, A. L. & Abdul-Aziz, AR. (2015). Building Maintenance Processes and Practices. Malaysia: Springer.

Olanrewaju, A., Tan, Y.Y., Soh, S.N. Defect Characterizations in the Malaysian affordable housing (2022) International Journal of Building Pathology and Adaptation, 40 (4), pp. 539- 568.

Rhodes. B. & Smallwood, J. J. 2002. Defect and rework in south African construction project. In: Morledge, R. (ed.). Proceeding of the RICS Foundation Construction and Building Research Conference (COBRA 2002), 5-6 September, Nottingham Trent University, Nottingham. 1-15

Downloads

Published

2026-11-05

How to Cite

Abdullah, M. N., Mamat, M. E., Zainal Abidin, Z., Zainuddin, M. F., & Shuib, M. N. (2026). Investigating factors causing defects in Industrialised Building System (IBS) implementation for the People’s Housing Programme (PPR) in Parit Buntar, Perak. Journal of Islamic, Social, Economics and Development, 11(88), 31–39. https://doi.org/10.55573/JISED.118803